COMPOSITIONS
Down the main page


Produced colors
Publications about [UNIPOL]®
Comparative tables
Technical descriptions
Instructions beyond the putting
Stamp A
Stamp AP
Stamp B
Stamp [v]
Stamp G
Stamp [PV]
Forms of the agreements
Questions and the answers
on-line- consultation



Managers:
ICQ 432360199432360199 Julia
SEARCH ON THE SITE:

Information

Instruction beyond putting of the feeding sexes

on basis of materials “[UNIPOL]- waterproofing” and priming enamel [SBE]-111 “OF [UNIPOL]” stamp AP (base - concrete).

  • the weatherproof, elastic, wear-resistant coating is formed
  • the outstanding chemical stability of coating to the solutions of acids and alkalis
  • coating maintains temperature from minus of 60°[S] to plus of 100°[S]

Surface preparation of concrete and reinforced concrete

The quality of surface preparation plays the decisive role. Concrete sex must be flat, clean and dry. Before putting of priming enamel [SBE]-111 “OF [UNIPOL]” the surface of concrete sex must be evened and removed based on it lime milk, upper fragile layer of concrete and remainders of old coatings. This task is performed due to the grinding of concrete sex by mosaic- polishing machines or treatment as far as shot-blast aggregates. After grinding it is necessary to remove dust, swarf and other pollution. Paul to dry. The presence on the concrete of the spots of the worked out machine oil or other chemical compositions is inadmissible.

Putting and the polymerization

The process of putting and polymerization of all materials must be carried out with the following conditions: optimum temperature from minus of 10°[S] to plus of 30°[S], optimum humidity 80%.

Method of application “[UNIPOL]- waterproofing”

“[UNIPOL] - waterproofing” - the single-component moisture-proof paste, ready to application.

Paste is highly technological, it makes it possible to use the mechanized and manual putting, it is used without the additional reinforcement. Before the use the paste should be thoroughly mixed throughout entire volume.

Paste contains the organic solvents (solvent), the content of dry matter to 75% of weight if necessary “[UNIPOL] - waterproofing” is diluted down the necessary viscosity by solvent. The time of the drying of coating down “the tackiness” - is tentatively not more than 2 hours. The time of drying depends on the ambient temperature, thickness of the substituted layer and is determined as far as the completeness of the evaporation of the solvent being contained before it.

Method of application of priming enamel [SBE]-111 “OF [UNIPOL]” stamp AP

Priming enamel [SBE]-111 “OF [UNIPOL]” stamp AP is let out ready to application. Before the application the enamel should be thoroughly mixed. Enamel is brought by brush, roller or dispersion. During the thickening the enamel is diluted down the working viscosity by solvent, xylene, toluene. The same solvents can be used for the washing of tool, container and spots. The total time of drying at a temperature from -15 to +30°[S] is from 10 to 20 days.

Table of №1. the diagram of the painting
Diagram of the painting Stamp of priming enamel [SBE]-111 “OF [UNIPOL]” Time of drying for putting the following layer
First layer (impregnating): “[UNIPOL] - waterproofing” to dilute down the working viscosity 40 s on the viscosimeter of the type Of [v]3-246 ([VZ]-4) with the diameter of nozzle 4 mm not less than 1 the hour
Second layer 900-1000 m “[UNIPOL]- waterproofing” not less than 24 hours
Third layer: 350-400 m of [g]/[e] [SBE]-111 “OF [UNIPOL]” stamp AP

Note:

  • to subject down load, to walk by means of the surface after 24 hours;
  • full mechanical and chemical load in 20 days.

Consumption, the thickness of the coating

The recommended thickness of coatings is 1000-1500 m.

Consumption “[UNIPOL]- waterproofing” is tentatively 2,4-2,8 kgf on 1 sq. m. of surface down 1000 m.

The expenditure of priming enamel [UNIPOL] for one layer is tentatively 0,8-0,9 kgf on 1 sq. m. of surface.

Precautionary measures

With conducting of internal work, and after their end thoroughly to also air accomodation. To use individual protective means.

Storage

Not to heat. To take care from the fire. Composition to store before the solidly closed container, protecting from the action of heat and straight solar rays. Guarantee period of storage - 6 months based on the day of production.

To unseal the page

Home Sitemap Contact us

Trusted site that we recommend to visit are:
moto.elegant-auto.co.uk , erotic , swinemünde hotel , krakow tours , Glam celebrity fashion woman., apartment swinoujscie