|
Priming enamel [SBE]-111 [UNIPOL]® of the stamp OF AM is intended for the anticorrosive protection of the steel constructions, which are exploited due to the conditions of the atmosphere of the industrial zone of the moderate and cold climate.
| Index |
Value |
| Connecting basis: |
Silicone- acrylic |
| Composition: |
Single-component, ready to the application |
| The dry residue: |
Not less than 50% |
| The relative viscosity of enamel at a temperature (20±0,5) of °C on the viscosimeter of the type Of [v]3-246 (or [VZ]-4) with the diameter of nozzle 4 mm: |
Not less than 100 it flogged |
| Degree of the grinding: |
Not are more than 50 m |
| Color: |
Any, orientator is catalog RAL |
| Degree of the dilution: |
10-15% of the total volume |
| Storage |
Not to heat. To take care from the fire. Composition to store before the solidly closed container, protecting from the action of heat, the straight lines of the solar of rays and moisture. Guarantee period of storage before the hermetically sealed container of manufacturing plant - six months based on the day of the production |
| Diluents: |
Xylene, solvent, toluene |
| Putting: |
By brush, by roller, by the methods of the pneumatic and airless dispersion |
| Quantity of the layers: |
2-3 depending on the method of the putting |
| Expenditure and the thickness of the coating: |
With the recommended thickness of coating 140-160 m the theoretical flow rate ~ of 0,41-0,46 [kg]/[m]2 |
| Putting conditions |
Priming enamel is allowed to bring at an ambient temperature and painted surface from minus of 25o[S] to 35o[S] and high relative humidity of air. |
| The time of drying the coating with a thickness of 80 m at a temperature (20±2) of o[S] and [f]=65% down the degree “of 3” according to GOST 19007, is not more |
1 hours. |
| The complete set of the physicomechanical properties of the coating with a thickness of 140-160 m at a temperature of 20oC and relative humidity of air 65% |
7-8 days |
| Index |
Value |
| The exterior view of the coating |
Uniform lusterless surface without the foreign inclusions |
| Wear resistance of coating according to GOST 20811-75 (method a) |
3,3 kgf/m |
| Strength of film with the bend |
not more than 1 mm |
| Adhesion, according to GOST 15140-78 method 2 |
is not more than 1 mark |
| Strength of film with the impact |
not less than 50 cm |
| Hiding power of the dried coating |
not more than 60 [g]/[m]2 |
| Hardness about the pendulum gravimeter M-3 |
not less than 0,3 conv. un. (coating collects hardness during 15-20 days) |
| The resistance of film to static action by 3% of solution Of n[aS]l with (50±5)°[S], thickness of the layer is 150 m |
not less than 48 hours |
Surface preparation:
| Index |
Value |
| C[tal]: |
down the degree of cleaning S[a] 2,5 (ISO 8501-1). Good results are achieved by surface preparation down the degree St of 3 on ISO 8501-1.
|
|